...
首页> 外文期刊>Operations Research >Scheduling model for multi-stage flow lines with zero lead times
【24h】

Scheduling model for multi-stage flow lines with zero lead times

机译:提前期为零的多级流水线调度模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mathematical programming models for lot-sizing and scheduling to provide customers with practically useful due dates and reduce throughput times with minimum costs. In a multi-period multi-stage model with fixed led time can lead to unnecessarily planned lead times. This paper presents a model which works without a positive lead time offset while resulting in a feasible material flow throughout the planning horizon minimizing the setup, holding, and backordering costs. This model is suitable for consumer goods or pharmaceutical industry where the material between successive production-stages is delinked because of inventories of products at intermediate stages. (23 refs.)
机译:用于批量设计和计划的数学编程模型,可为客户提供实用的到期日,并以最小的成本减少生产时间。在具有固定提前期的多周期多阶段模型中,可能会导致不必要的计划提​​前期。本文提出了一个模型,该模型在没有正提前期偏移的情况下工作,同时在整个计划范围内产生了可行的物料流,从而最大程度地减少了设置,保管和缺货的成本。该模型适用于消费品或制药行业,由于中间阶段的产品库存,连续生产阶段之间的物料被取消链接。 (23篇)

著录项

  • 来源
    《Operations Research》 |2014年第4期|339-340|共2页
  • 作者单位

    Universitat Hamburg, Institut fur Logistic und Transport, Germany;

    Leibniz Universitat Hannover, Institut fur Produktionswirtschaft, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号