...
首页> 外文期刊>Offshore Engineer >West Delta Deep West Delta Deep Marine, Egypt
【24h】

West Delta Deep West Delta Deep Marine, Egypt

机译:西部三角洲深埃及西部三角洲深

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Phase IV of the West Delta Deep Marine subsea gas development began producing in 1Q 2008, shortly after the BG-led Burullus Gas Group sanctioned phase V. Phase IV began production through seven wells, which went online a month ahead of schedule and under budget. Factoring phase IV into the overall West Delta Deep Marine development, there are 31 subsea wells. The field first began producing in 2003 with eight wells at the Scarab and Saffron fields. Two years later, the group expanded the development with 16 additional wells on the Simian and Sienna fields for phase II and the Sapphire field for phase III.
机译:在BG领导的Burullus天然气集团批准了第五阶段之后不久,西三角洲深海海底天然气开发的第四阶段已于2008年第一季度开始生产。第四阶段开始通过7口井进行生产,该生产井比计划提前一个月上线,且预算不足。将第四阶段纳入整个西三角洲深海开发项目,其中有31口海底井。该油田于2003年开始在圣甲虫和藏红花油田生产8口井。两年后,该小组通过在Simian和Sienna油田进行的第二阶段和在Sapphire油田进行的第三阶段扩展了16口井,从而扩大了开发范围。

著录项

  • 来源
    《Offshore Engineer》 |2009年第4期|67-67|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号