首页> 外文期刊>Offshore Engineer >Thunder (Horse) rolls
【24h】

Thunder (Horse) rolls

机译:雷声(马)

获取原文
获取原文并翻译 | 示例
       

摘要

This year is set to be an exciting one for BP. The firm is looking to bring seven pro jets online in 2017. One project, the Thunder Horse South Expansion (THSX) in the deepwater Gulf of Mexico (GoM), was originally slated for start up in late 2017, but it had the good fortune to come online earlier than scheduled, due to good planning and execution. The THSX project is expected to boost production at the Thunder Horse facility by an estimated 50,000 gross boe/d. BP achieved this with the installation of two new 11,000ft flowlines, and a four-slot manifold, which creates a new subsea drill center (No. 45), 2mi south of the Thunder Horse platform.
机译:对于BP来说,今年将是激动人心的一年。该公司希望在2017年使7架专业喷气式飞机上线。其中一个项目是位于墨西哥湾深水区(GoM)的Thunder Horse South Expansion(THSX),原定于2017年底启动,但它的运气不错由于有良好的计划和执行力,因此可以比原计划提前上线。 THSX项目预计将使雷马工厂的产量提高约50,000总桶油当量/日。 BP通过安装两条新的11,000英尺长的输油管和一个四槽歧管实现了这一目标,该管线在Thunder Horse平台以南2英里处创建了一个新的海底钻探中心(第45号)。

著录项

  • 来源
    《Offshore Engineer》 |2017年第5期|88-91|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:10:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号