...
首页> 外文期刊>Nucleonics week >Notes to Nucleonics Week generating tables for October 2020
【24h】

Notes to Nucleonics Week generating tables for October 2020

机译:核心周发行于2020年10月的核查

获取原文
获取原文并翻译 | 示例
           

摘要

In France, Blayais-3 returned Oct. 14 from refueling that began June 13; Cattenom-4 refueled from Sept. 5 to Oct. 25; Chinon-B1 shut from Aug. 14 to Oct. 12; Chinon-B4 shut May 29 for refueling and an overhaul expected to last until mid-December; Dampierre-3 returned Oct. 8 from refueling that began Sept. 12; Golfech-1 shut Aug. 15 for refueling and remained offline at press time; Gravelines-1 returned Nov. 9 from refueling that began Aug. 22; Paluel-3 refueled from June 20 to Oct. 25; Penly-1 shut May 15 for refueling, returning Oct. 14.
机译:在法国,Blayais-3 10月14日从6月13日开始加油; Cattenom-4从9月5日至10月25日起加油; Chinon-B1从8月14日到10月12日关闭; Chinon-B4关闭5月29日加油,预计将持续到12月中旬的大修; Dampierre-3 10月8日从加油中开始于9月12日开始; Golfech-1 8月15日关闭了加油,并在新闻时仍然离线; 11月9日11月9日返回的砾石-1 .2月22日开始加油; Paluel-3从6月20日至10月25日加油; Penly-1关闭5月15日加油,10月14日返回。

著录项

  • 来源
    《Nucleonics week》 |2020年第50期|7-15|共9页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号