首页> 外文期刊>Nuclear Technology >Design Studies for the Optimization of ~(238)Pu Production in NpO_2 Targets Irradiated at the High Flux Isotope Reactor
【24h】

Design Studies for the Optimization of ~(238)Pu Production in NpO_2 Targets Irradiated at the High Flux Isotope Reactor

机译:在高通量同位素反应器辐照的NPO_2靶中优化〜(238)PU生产的设计研究

获取原文
获取原文并翻译 | 示例
           

摘要

Efforts to reestablish a domestic ~(238)Pu production capability in support of National Aeronautics and Space Administration mission objectives are ongoing throughout the U.S. Department of Energy complex. The Plutonium-238 Supply Project (PSP) was initiated in response to a report published by the National Research Council in 2011 stating that "without a restart of ~(238)Pu production, it will be impossible for the United States, or any other country, to conduct certain important types of planetary missions after this decade." The PSP is targeting a sustained, constant production rate of 1.5 kg/year of heat source PuO_2 for several years. Design and optimization studies of ~(237)Np-bearing targets are underway at Oak Ridge National Laboratory (ORNL). It is anticipated that targets will be irradiated in ORNL's High Flux Isotope Reactor (HFIR) and in the Advanced Test Reactor (ATR) at Idaho National Laboratory. A variety of target materials, containments, arrangements, and irradiation histories have been analyzed, and the results indicate that a sufficient quantity of~(238)Pu can be produced in HFIR and ATR to fulfill the PSP's constant production rate target. This paper focuses on the design and optimization of new target configurations containing pellets that are (1) -93% of the theoretical density of NpO_2, (2) loaded into pins of cladding materials that can be handled as solid waste following postirradiation ~(238)Pu recovery operations, (3) irradiated in various vertical experiment facility (VXF) locations in the HFIR permanent beryllium reflector, and (4) rotated within and/or moved to another VXF location following each HFIR operational cycle to maximize ~(238)Pu production and minimize peak heat generation rates.
机译:重新建立国内〜(238)PU生产能力的努力,以支持美国国家航空航天局的使命目标在整个美国能源复合体中正在进行。钚-238供应项目(PSP)是回应2011年国家研究理事会发布的一份报告,指出“没有重启〜(238)PU生产,美国是不可能的,或者任何其他国家,在十年后开设某些重要类型的行星任务。“ PSP持续,持续的,生产率为1.5公斤/年的热源Puo_2几年。奥克岭国家实验室(ORNL)正在进行〜(237)NP轴承目标的设计和优化研究。预计靶向在爱达荷州国家实验室的ornl的高通量同位素反应器(HFIR)和高级测试反应器(ATR)中将在ORNL的高通量同位素反应器(HFIR)中进行辐照。已经分析了各种目标材料,遏制,布置和辐射历史,结果表明,足够量的〜(238)PU可以在HFIR和ATR中产生,以满足PSP的恒定产量目标。本文侧重于含有颗粒的新目标配置的设计和优化,其中(1)-93%的NPO_2,(2)装入包层材料的销钉,可以作为PostIrdiation之后固体废物处理〜(238 )PU恢复操作,(3)在HFIR永久性铍反射器的各种垂直实验设施(VxF)位置照射,(4)在每个HFIR操作周期后旋转和/或移动到另一个VXF位置,以最大化〜(238) PU生产并最大限度地减少峰值发热速率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号