...
【24h】

Status of the Siam Photon Source

机译:暹罗光子源的状态

获取原文
获取原文并翻译 | 示例
           

摘要

The present status of the Siam Photon Source is reported. The 1 GeV storage ring has been filled with the electron beam successfully. The finer adjustment of the accelerator complex and the improvement of the associated utilities are being carried out. The construction of the undulator to be installed in the storage ring will start in a few months. The first two beam lines have been installed. A photoemission experimental station will soon be installed in one of the beam lines. The substantial part of the reformation and reassembly of the machine as well as various problems to overcome are also described briefly along with the plan for next two years.
机译:报告了暹罗光子源的当前状态。 1 GeV存储环已成功充满电子束。加速器综合体的细调和相关实用程序的改进正在进行中。几个月后将开始建造将要安装在存储环中的波荡器。前两条光束线已安装。一个发光实验站将很快安装在其中一条光束线上。还简要介绍了机器的改造和重新组装的主要部分,以及要克服的各种问题以及接下来的两年计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号