首页> 外文期刊>Nuclear Instruments & Methods in Physics Research. B, Beam Interactions with Materials and Atoms >High-power beam dump system for the BigRIPS fragment separator at RIKEN RI Beam Factory
【24h】

High-power beam dump system for the BigRIPS fragment separator at RIKEN RI Beam Factory

机译:RIKEN RI Beam Factory的BigRIPS碎片分离器大功率光束转储系统

获取原文
获取原文并翻译 | 示例

摘要

The high-power beam dump system for the BigRIPS fragment separator at the RIKEN Nishina Center RI Beam Factory was designed to handle ion beams up to ~(238)U at 345 MeVucleon and intensity of 1 particle μA A water-cooled stationary beam dump system utilizing screw or swirl tubes as water cooling channels was developed based on detailed thermal simulation. Since March 2007, the system has been successfully operated with the various beams at the RI Beam Factory (RIBF), although the available beam power remains less than one-tenth of the goal. Temperatures of beam spots at the beam dump were measured and compared with the thermal simulations to evaluate the cooling capacity of the systems.
机译:RIKEN Nishina Center RI Beam Factory的BigRIPS片段分离器的高功率束流转储系统旨在处理离子强度高达1MeA的离子束,其离子强度为345 MeV /核子时高达〜(238)U基于详细的热模拟,开发了利用螺旋管或涡流管作为水冷却通道的倾卸系统。自2007年3月以来,该系统已在RI Beam Factory(RIBF)上成功使用各种光束运行,尽管可用光束功率仍不到目标的十分之一。测量了光束收集器处光束点的温度,并将其与热模拟进行比较,以评估系统的冷却能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号