首页> 外文期刊>Nuclear Instruments & Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment >Commissioning of the read-out driver (ROD) card for the ATLAS IBL detector and upgrade studies for the pixel Layers 1 and 2
【24h】

Commissioning of the read-out driver (ROD) card for the ATLAS IBL detector and upgrade studies for the pixel Layers 1 and 2

机译:调试用于ATLAS IBL检测器的读出驱动器(ROD)卡,并对像素第1层和第2层进行升级研究

获取原文
获取原文并翻译 | 示例

摘要

The higher luminosity that is expected for the LHC after future upgrades will require better performance by the data acquisition system, especially in terms of throughput. In particular, during the first shutdown of the LHC collider in 2013/14, the ATLAS Pixel Detector will be equipped with a fourth layer - the Insertable B-Layer or IBL - located at a radius smaller than the present three layers. Consequently, a new front end ASIC (FE-I4) was designed as well as a new off-detector chain. The latter is composed mainly of two 9U-VME cards called the Back-Of-Crate (BOC) and Read-Out Driver (ROD). The ROD is used for data and event formatting and for configuration and control of the overall read-out electronics. After some prototyping samples were completed, a pre-production batch of 5 ROD cards was delivered with the final layout. Actual production of another 15 ROD cards is ongoing in Fall 2013, and commissioning is scheduled in 2014. Altogether 14 cards are necessary for the 14 staves of the IBL detector, one additional card is required by the Diamond Beam Monitor (DBM), and additional spare ROD cards will be produced for a total of 20 boards. This paper describes some integration tests that were performed and our plan to test the production of the ROD cards. Slices of the IBL read-out chain have been instrumented, and ROD performance is verified on a test bench mimicking a small-sized final setup. This contribution will report also one view on the possible adoption of the IBL ROD for ATLAS Pixel Detector Layer 2 (firstly) and, possibly, in the future, for Layer 1.
机译:未来升级后LHC预期的更高的发光度将要求数据采集系统具有更好的性能,尤其是在吞吐量方面。特别是在2013/14年度LHC对撞机首次关闭期间,ATLAS像素检测器将配备第四层-可插入的B层或IBL,其半径小于当前的三层。因此,设计了新的前端ASIC(FE-I4)以及新的检波器链。后者主要由两个9U-VME卡组成,分别称为板条箱(BOC)和读出驱动器(ROD)。 ROD用于数据和事件格式化以及整个读取电子设备的配置和控制。在完成一些原型样品后,将交付5张ROD卡的预生产批次,并带有最终版图。 2013年秋季将继续实际生产15张ROD卡,并计划在2014年进行调试。IBL检测器的14段五线谱总共需要14张卡,Diamond Beam Monitor(DBM)需要一张卡,另外一张备用ROD卡将总共生产20个板。本文介绍了已执行的一些集成测试以及我们测试ROD卡生产的计划。已对IBL读取链的各个部分进行了检测,并在模拟小型最终设置的测试台上验证了ROD性能。这份文稿还将报告一种观点,即对于ATLAS像素检测器第2层(首先)以及将来(可能在将来)第1层可能采用IBL ROD。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号