ESTIMATING THE OPERATOR'S PERFORMANCE TIME OF EMERGENCY PROCEDURAL TASKS BASED ON A TASK COMPLEXITY MEASURE

机译:基于任务复杂性度量的操作员紧急程序任务执行时间估算

获取原文
获取原文并翻译 | 示例

摘要

It is important to understand the amount of time required to execute an emergency procedural task in a high-stress situation for managing human performance under emergencies in a nuclear power plant. However, the time to execute an emergency procedural task is highly dependent upon expert judgment due to the lack of actual data. This paper proposes an analytical method to estimate the operator's performance time (OPT) of a procedural task, which is based on a measure of the task complexity (TACOM). The proposed method for estimating an OPT is an equation that uses the TACOM as a variable, and the OPT of a procedural task can be calculated if its relevant TACOM score is available. The validity of the proposed equation is demonstrated by comparing the estimated OPTs with the observed OPTs for emergency procedural tasks in a steam generator tube rupture scenario.
机译:重要的是要了解在高压力情况下执行紧急程序任务以管理核电厂紧急情况下的人员绩效所需的时间。但是,由于缺乏实际数据,执行紧急程序任务的时间在很大程度上取决于专家的判断。本文提出了一种分析方法,用于估计程序性任务的操作员执行时间(OPT),该方法基于对任务复杂性(TACOM)的度量。提出的估计OPT的方法是使用TACOM作为变量的方程式,并且如果程序任务的相关TACOM分数可用,则可以计算过程任务的OPT。通过比较估计的OPT与观察到的OPT在蒸汽发生器管破裂情况下的紧急程序任务中的有效性,该方程式是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号