Load factor tables

机译:负载系数表

获取原文
获取原文并翻译 | 示例
       

摘要

Annual load factors for units over the 12 months to end September 2008, and lifetime (which are also called cumulative) load factors to end September 2008, are presented in Table 1. The figures are calculated on the same basis as that used since early 1976 so that trends can be established.rnAnnual load factors are calculated by dividing the gross generation of a reactor in a one-year period by the gross capacity of the reactor (sometimes called output), as originally designed, multiplied by the number of hours in the calendar year. The figures are expressed as percentages. Where a plant is uprated, the revised capacity is used from the date of the uprating.
机译:表1列出了截止到2008年9月的12个月中单位的年度载荷因子,以及截止到2008年9月的寿命(也称为累积)载荷因子。这些数字的计算与1976年初以来的计算基础相同。年负荷系数的计算方法是:将一年期间的反应堆总发电量除以最初设计的反应堆总容量(有时称为输出),再乘以小时数。日历年。这些数字以百分比表示。如果工厂进行了升级,则从升级之日起使用修订的产能。

著录项

  • 来源
    《Nuclear Engineering International》 |2009年第655期|32|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:49:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号