Prioritizing inspections

机译:优先检查

获取原文
获取原文并翻译 | 示例
       

摘要

Risk-informed activities (for example NRC Reactor Oversight Process, Maintenance Rule implementation at power plant sites, and so on) have demonstrated the usefulness of risk information in focussing resources on activities with greater safety significance. This proved to be the case also for prioritizing ITAAC. The NRC staff found the design PRA, D-RAP and other risk-related information obtained through the NRC staff review of the design certification application and the knowledge of the NRC staff involved in the review process to be valuable to the process of prioritizing ITAAC.
机译:具有风险意识的活动(例如NRC反应堆监督程序,电厂现场维护规则的执行等)已经证明了风险信息在将资源集中于具有更大安全意义的活动上的有用性。事实证明,优先考虑ITAAC也是这种情况。 NRC的工作人员发现,通过NRC的人员对设计认证申请进行审查而获得的设计PRA,D-RAP和其他与风险相关的信息以及参与审查过程的NRC的人员的知识对于确定ITAAC的优先级过程很有价值。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第721期|21-23|共3页
  • 作者单位

    USNRC, Washington DC 20555-0001 USA;

    USNRC, Washington DC 20555-0001 USA;

    USNRC, Washington DC 20555-0001 USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号