【24h】

Oh No: Regulator!

机译:哦,不!

获取原文
获取原文并翻译 | 示例
       

摘要

After some months of anticipation, I was interested to hear from the UK's newly-reformed Office of Nuclear Regulation, still a state enterprise, but now occupying a position outside of central government as a public corporation. Although I confess I still haven't really understood how this change will affect the UK fleet of nuclear power plants, the new ONR does have some interesting items on its plate: there is the restart of the AP1000 design assessment now that Westinghouse has taken a stake in new-build utility consortium NuGen, the design assessment of the Hitachi ABWR, the UK's first BWR, any Hinkley Point C site-specific assessment items, plus the day-to-day regulation of 16 operating reactors and another two dozen undergoing decommissioning, plus lots of other responsibilities.
机译:经过几个月的期待,我很想听到英国新近改革的核监管局的消息,该局仍然是一家国营企业,但是现在担任中央公司以外的公众公司。尽管我承认我仍然还不太了解这种变化将如何影响英国的核电站,但新的ONR确实有一些有趣的内容:由于西屋电气已经采取了AP1000设计评估,现在重新开始新建公用事业财团NuGen的股份,日立ABWR的设计评估,英国首个BWR,任何欣克利角C现场特定评估项目,以及对16座运行中的反应堆的日常监管,另有2座正在进行退役,还有很多其他责任。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第718期|5-5|共1页
  • 作者

    Will Dalrymple;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号