首页> 外文期刊>Nuclear Engineering International >Paladin shuts Kayelekera (for now)
【24h】

Paladin shuts Kayelekera (for now)

机译:圣骑士关闭了Kayelekera(目前)

获取原文
获取原文并翻译 | 示例
       

摘要

Australian mining company Paladin Energy has announced that it is putting its Malawian open-pit uranium mine Kayelekera in 'care and maintenance until the price of uranium recovers.' Managing Director and CEO of Paladin, John Borshoff, said: "The Kayelekera Mine has performed exceptionally well technically, with production levels recorded at or near nameplate capacity over the past 12 months and significant achievements made in PAL's cost-reduction programme ... Nevertheless, despite these considerable efforts, Kayelekera Mine continues to operate at a loss due to the low prevailing uranium price. Paladin is unable to continue to provide the level of financial support that PAL has required in recent years, hence the decision at this time."
机译:澳大利亚矿业公司帕拉丁能源公司(Paladin Energy)宣布,它将把其马拉维露天铀矿Kayelekera进行“保养和维护,直到铀价回升”。 Paladin的常务董事兼首席执行官John Borshoff表示:“ Kayelekera矿在技术上表现异常出色,过去12个月的产量水平达到或接近铭牌的产能,在PAL的降低成本计划中取得了显著成就。尽管付出了巨大的努力,但由于目前的铀价低廉,Kayelekera矿继续处于亏损状态。圣骑士无法继续提供PAL近年来所需的资金支持,因此,目前就此决定。”

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第716期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号