首页> 外文期刊>Nuclear Engineering International >Load factors by utility to end June 2013
【24h】

Load factors by utility to end June 2013

机译:公用事业部门的负载系数,截至2013年6月

获取原文
获取原文并翻译 | 示例
       

摘要

In the 12 months to the end of June 2013, data were available for 404 reactors rated at least 150 MWe gross which together generated about 2329 TWh of electricity. Combined total generation was down around 2% on the equivalent period the in 2011/12 period and 10% on the same period in 2010/11, principally due to the sustained closures of reactors in Japan. The average load factor of the operating reactors over the 12 months to end June 2013 was 67.7%, compared with 72.5% for 2011/12. For pressurized water reactors (263 units) the average load factor was 72.3%; boiling water reactors (83 units), 57.0%; pressurized heavy water reactors (45 units), 75.0% and RBMK (11 units) 81.0%. One magnox reactor was also in operation (Wylfa 1, UK), together with one fast breeder reactor (Beloyarsk 3) in Russia.
机译:到2013年6月底的12个月内,可获得404台反应堆的数据,这些反应堆的总发电量至少为150 MWe,总共发电约2329 TWh。总发电量比2011/12年同期下降约2%,比2010/11年同期下降10%,这主要是由于日本反应堆的持续关闭所致。截至2013年6月的12个月中,在运反应堆的平均负荷系数为67.7%,而2011/12年度为72.5%。对于压水堆(263台),平均负荷率是72.3%。沸水反应堆(83台),占57.0%;压重水反应堆(45台),占75.0%,RBMK(11台),占81.0%。俄罗斯也正在运行一台大口径反应堆(英国,Wylfa 1),以及一台快中子增殖反应堆(Beloyarsk 3)。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第715期|36-37|共2页
  • 作者

    Caroline Peachey;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号