首页> 外文期刊>Nuclear Engineering International >Market developments | Mew-build
【24h】

Market developments | Mew-build

机译:市场发展|喵建

获取原文
获取原文并翻译 | 示例
       

摘要

There are now 20 commercial reactors in operation in China-Ningde 2 being the latest having started operation in January 2014-and 28 reactors under construction on various sites, including Qinshan, Sanmen, Haiyang, Yangjiang, Hongyanhe, Fuqing, Ningde, Fangjiashan and Taishan. A remarkable feature is that work is commencing on third and fourth units at several sites, immediately after the initial two units, with sites anticipated eventually to take six or more reactors. The largely indigenous CPR-1000 reactor is the mainstay of the programme, at least for now, but construction is underway of four Westinghouse AP1000S and two AREVA EPRs.
机译:中国目前有20座商业反应堆在运营,宁德2座最新反应堆已于2014年1月开始运行,秦山,三门,海阳,阳江,红岩河,福清,宁德,方家山和泰山等不同地点正在建设28座反应堆。 。一个显着的特点是,在最初的两个机组之后,在几个地点的第三和第四个机组上开始工作,预计最终将占用六个或更多反应堆。该计划的主体是至少在目前为止是土著人的CPR-1000反应堆,但目前正在建设四台西屋AP1000S和两台AREVA EPR。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第715期|32-33|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号