Plan for first phase of safety demonstration tests of the High Temperature Engineering Test Reactor (HTTR)

机译:高温工程测试反应堆(HTTR)安全演示测试的第一阶段计划

获取原文
获取原文并翻译 | 示例
       

摘要

Safety demonstration tests using the High Temperature Engineering Test Reactor (HTTR) will be conducted for the purpose of demonstrating inherent safety features of High Temperature Gas-cooled Reactors (HTGRs) as well as providing the core and plant transient data for validation of HTGR safety analysis codes. The first phase safety demonstration test items include the reactivity insertion test and the coolant flow reduction test. In the reactivity insertion test, which is the control rod withdrawal test, one pair out of 16 pairs of control rods is withdrawn, simulating a reactivity insertion event. The coolant flow reduction test consists of the partial loss of coolant flow test and the gas circulators trip test. In the partial loss of coolant flow test, primary coolant flow rate is slightly reduced by control system. In the gas circulators trip test one and two out of three gas circulators are run down, simulating coolant flow reduction events. The gas circulators trip tests, in which position of control rods are kept unchanged, are simulation tests of anticipated transients without scram (ATWS).
机译:为了演示高温气冷堆(HTGR)的固有安全特性,并提供核心和工厂暂态数据以验证HTGR安全分析,将使用高温工程测试堆(HTTR)进行安全演示测试。代码。第一阶段安全演示测试项目包括反应性插入测试和冷却液流量减少测试。在反应性插入测试中,即控制棒退出测试,从16对控制棒中抽出一对,以模拟一个反应性插入事件。冷却液流量减少测试包括冷却液流量测试的部分损失和气体循环器跳闸测试。在部分冷却液流量损失测试中,控制系统会略微降低一次冷却液流量。在气体循环器跳闸测试中,三个气体循环器中的一个和两个被用尽,模拟冷却剂流量减少事件。气体循环器跳闸测试(其中控制杆的位置保持不变)是预期的无扰动瞬变的模拟测试(ATWS)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号