Main corrective measures in an early phase of nuclear power plants' preparation for safe long term operation

机译:核电厂准备安全长期运行的早期主要纠正措施

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the analysis of main technical deficiencies of nuclear power plants (NPPs) in preparedness for safe long term operation (LTO) and the main corrective measures in an early phase of preparation for safe LTO of NPPs. It focuses on technical aspects connected with management of physical ageing of NPP structures, systems and components (SSCs). It uses as a basis results of IAEA SALTO missions performed between 2005 and 2016 (see also paper NED8805 in Nuclear Engineering and Design in May 2016) and the personal experiences of the authors with preparation of NPPs for safe LTO. This paper does not discuss other important aspects of safe LTO of NPPs, e.g. national nuclear energy policies, compliance of NPPs with the latest international requirements on design, obsolescence, environmental impact and economic aspects of LTO. Chapter 1 provides a brief introduction of the current status of the NPP' fleet in connection with LTO. Chapter 2 provides an overview of SALTO peer review service results with a focus on deficiencies related to physical ageing of safety SSCs and a demonstration that SSCs will perform their safety function during the intended period of LTO. Chapter 3 discusses the main corrective measures which NPPs typically face during the preparation for demonstration of safe LTO. Chapter 4 summarizes the current status of the NPP' fleet in connection with LTO and outlines further steps needed in preparation for safe LTO. (C) 2017 Elsevier B.V. All rights reserved.
机译:本文介绍了核电厂(NPP)在准备长期安全运行(LTO)方面的主要技术缺陷以及在准备NPPs安全LTO的早期阶段的主要纠正措施。它侧重于与NPP结构,系统和组件(SSC)的物理老化管理相关的技术方面。它以2005年至2016年间执行的IAEA SALTO访问为基础(另见2016年5月《核工程与设计》中的NED8805号文件)以及作者为安全LTO准备核电厂的个人经验。本文没有讨论核电厂安全LTO的其他重要方面,例如国家核能政策,核电厂遵守有关LTO的设计,过时,环境影响和经济方面的最新国际要求。第1章简要介绍了与LTO相关的NPP舰队的当前状况。第2章概述了SALTO同行评审服务的结果,重点是与安全SSC的物理老化有关的缺陷,并论证了SSC将在LTO的预期时间内执行其安全功能。第3章讨论了核电厂在准备示范安全LTO时通常要面对的主要纠正措施。第4章总结了与LTO相关的NPP舰队的当前状况,并概述了准备安全LTO所需的进一步步骤。 (C)2017 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号