首页> 外文期刊>Modern Railways >GET IT RIGHT NEXTTIME PARTTWO - GETTING IT RIGHT
【24h】

GET IT RIGHT NEXTTIME PARTTWO - GETTING IT RIGHT

机译:下次正确获取它的权利第二部分-正确获取它的权利

获取原文
获取原文并翻译 | 示例
       

摘要

The stock for HS2 has been specified long before a rail is laid, but good news; the specification is much better than IEP's was.The parameters laid down now will define the rolling stock for decades to come and while there is a lot of good technical data and explanatory notes, some of the IEP's failings have been carried over like an inherited disease. Fortunately, some minor changes now could produce trains we can all be proud of rather than a conveyor belt of plastic seats. When we build an airport, do we tell Airbus or Boeing how to build the planes for it? If we build a new motorway (perish the thought), do we specify the lorries and cars to use it? Uniquely, build a new railway and a government department, with a proven track record in disaster, will specify the trains.
机译:HS2的库存已在铁路铺设之前就已确定,但这是个好消息。该规范比IEP的要好得多。现在设定的参数将定义未来数十年的机车车辆,尽管有许多良好的技术数据和说明性注释,但IEP的某些失败已像遗传病一样被延续了下来。 。幸运的是,现在可以进行一些小的改动,生产出我们所有人都值得骄傲的火车,而不是塑料座椅输送带。当我们建造一个机场时,我们是否告诉空中客车公司或波音公司如何为其建造飞机?如果我们建造一条新的高速公路(使想法破灭),我们是否指定使用卡车和汽车?独特地,建造一条新的铁路,并且在灾难中具有良好记录的政府部门将指定列车。

著录项

  • 来源
    《Modern Railways》 |2020年第6期|40-41|共2页
  • 作者

    Ian Walmsley;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:25:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号