首页> 外文期刊>Model railroader >Restartingfrom Scratch
【24h】

Restartingfrom Scratch

机译:从头开始

获取原文
获取原文并翻译 | 示例
       

摘要

My wife and I had to make a move in early 2001, not long after I wrote about my HO scale Puffer Bridge Lines for Great Model Railroads 2002. This required me to dismantle and move the railroad. It was an emotionally wrenching experience to tear down the completed layout. My intention at the time was to rebuild it much as it was. I was happy with it, so why change, right? That's where my modeling friends enter the story. They all said, "You've got a great space here. Why not use it?" That night, the railroad took its first step to what it has become today.
机译:我和我妻子于2001年初采取了行动,不久之后,我写了我的HO比例2002年大型模型铁路的HO比例Puffer桥线。这需要我拆除和移动铁路。拆除完整的版面是一种令人痛苦的经历。当时,我的意图是对其进行尽可能多的重建。我对此很满意,所以为什么要改变,对不对?那是我的模特朋友进入故事的地方。他们都说:“您在这里有很大的空间。为什么不使用它呢?”那天晚上,铁路迈出了今天的第一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号