首页> 外文期刊>Mining Engineering >Herrenknecht double shield breaks records in Spain
【24h】

Herrenknecht double shield breaks records in Spain

机译:海瑞克双护盾打破西班牙纪录

获取原文
获取原文并翻译 | 示例
           

摘要

The Spanish Herrenknecht branch managers Francisco Avila Aranda and Juan Arroyo mentioned several factors to explain the speedy progress in the tunneling activities: the experienced construction site team of FCC Construcción S.A. and Construcciones Sanchez Dominguez-Sando S.A., the logistics system which was planned in detail and the tunnel boring machine which was precisely adapted to the geology consisting of hard limestone. Furthermore, the construction site team, excellently trained and coordinated by the construction company and the perfect logistics system contributed to this extraordinary performance.
机译:西班牙海瑞克分公司经理弗朗西斯科·阿维拉·阿兰达和胡安·阿罗约提到了几个因素来解释隧道施工的迅速进展:FCCConstrucciónSA和Construcciones Sanchez Dominguez-Sando SA的经验丰富的建筑工地团队,详细规划了物流系统,隧道掘进机,它精确地适应了由硬石灰石组成的地质。此外,施工现场团队经过建筑公司的出色培训和协调,以及完善的物流系统,为这一非凡的业绩做出了贡献。

著录项

  • 来源
    《Mining Engineering》 |2009年第3期|p.1-2|共2页
  • 作者

    Anonymous;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号