首页> 外文期刊>Mining Engineering >Oversize reduction project at the Iron Ore Company of Canada
【24h】

Oversize reduction project at the Iron Ore Company of Canada

机译:加拿大铁矿石公司的超大型减量项目

获取原文
获取原文并翻译 | 示例
           

摘要

The first phase of the expansion project involves the acquisition of new drilling, loading and hauling equipment at the mine, the construction of an inpit crusher, the construction of a new overland conveyor linking the crusher to the concentrator, the installation of an additional autogenous grinding (AG) mill at the concentrator, as well as upgrades to the power supply to the plant and the acquisition of new railway locomotives and ore cars. Since the implementation of the thickened emulsion at the end of the first quarter 2009, there has been a significant reduction in downtime hours due to bridging at the crusher.
机译:扩建项目的第一阶段包括在矿山上购买新的钻探,装载和牵引设备,建造破碎机,建造将破碎机连接到选矿机的新陆上输送机,安装额外的自磨(AG)选矿厂,以及对该工厂的电源升级以及购买新的铁路机车和矿车。自从2009年第一季度末实施增稠的乳液以来,由于在破碎机上架桥,停机时间大大减少了。

著录项

  • 来源
    《Mining Engineering》 |2011年第5期|p.20-31|共12页
  • 作者

    R Pinksen R P Proulx;

  • 作者单位

    R. Pinksen is with Iron Ore Co. of Canada, Labrador City, NL Canada R.P. Proulx is with Orica USA Inc., Watkins, CO, e-mail remi. proulx@ orica.com.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号