首页> 外文期刊>Microelectronics & Reliability >Modification of scheduled data flow graph for on-line testabiltiy
【24h】

Modification of scheduled data flow graph for on-line testabiltiy

机译:修改计划数据流图以进行在线验证

获取原文
获取原文并翻译 | 示例
       

摘要

An approach to modify a given scheduled data flow graph (SDFG) for improving on-line testabiltiy for a data path is presented. Each functional unit (FU) of a data path is tested at least once in a time frame called pass. The approach utilizes idle-time of FUs. A given SDFG is utilized to estimate the number of FUs and their idle periods in which certain operations, called idle-time operations, are scheduled. Modified SDFG is utilized by our FU allocation tehcnique presented earlier that minimizes the testing time. Addition of idle-time operations improves the testabilty without affecting FUs' count. The techniuqe yields promising results.
机译:提出了一种修改给定的计划数据流图(SDFG)的方法,以改善数据路径的在线可验证性。数据路径的每个功能单元(FU)在称为pass的时间范围内至少测试一次。该方法利用了FU的空闲时间。给定的SDFG用于估计FU的数量及其空闲时段,在这些空闲时段中,某些操作被称为空闲时间操作。前面介绍的FU分配技术使用了修改后的SDFG,可最大程度地缩短测试时间。增加空闲时间操作可以提高可测试性,而不会影响FU的数量。该技术产生了可喜的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号