Five years ago, when the engineers at Smiths Aerospace, in Yakima, Wash., wanted to make a cylinder used on an actuator for landing gear, the production process could take months. With bosses, lugs, bearing holes, and bearing flats, the piece would have to visit several machines, each of which would have to be programmed separately.
展开▼