首页> 外文期刊>Mathematical Problems in Engineering >Risk Propagation of Delayed Payment in Stakeholder Network of Large Hydropower Project Construction considering Risk Resistance and Mitigation
【24h】

Risk Propagation of Delayed Payment in Stakeholder Network of Large Hydropower Project Construction considering Risk Resistance and Mitigation

机译:考虑风险抵抗和缓解的大型水电项目建设利益相关者网络延迟付款的风险传播

获取原文
获取原文并翻译 | 示例

摘要

Large hydropower project involves numerous stakeholders in the construction phase. The risk of delayed payment may escalate into an event of catastrophic economic loss through complex stakeholders' relationships. This paper builds a complex stakeholder network by collecting all contract prices in large hydropower project construction (LHPC) and proposes a novel mathematical model based on Cellular Automata Susceptible-Infected-Susceptible (CA-SIS) framework to analyze the risk propagation of delayed payment (RPDP). In the model, to approximate actual loss diffusion, risk-resisting and risk-mitigating abilities of stakeholders are combined, and relevance between risk mitigation and time is taken into account. The rationality and feasibility of the novel model are illustrated through its application to an actual LHPC. The simulation results include the following: RPDP presents three phases: risk first slightly propagates, risk then exponentially breaks out, and at last propagation consequence will reach a stable state related to stakeholders' risk-resisting ability closely; in respect of stakeholders' risk-mitigating ability and property of the network, RPDP range decreases with the increase of number of partners and homogeneity of contract price distribution; in respect of stakeholders' risk-resisting ability, RPDP range decreases with the decrease of number of partners. This research can serve as a powerful complement to analyze and control the delayed payment in LHPC.
机译:大型水电项目在建设阶段涉及众多利益相关者。由于复杂的利益相关者关系,延迟付款的风险可能会升级为灾难性的经济损失。本文通过收集大型水电项目建设(LHPC)中的所有合同价格建立了一个复杂的利益相关者网络,并提出了一种基于Cellular Automata易受感染的易感性(CA-SIS)框架的新颖数学模型,以分析延迟付款的风险传播( RPDP)。在模型中,为了近似实际损失的扩散,将利益相关者的抗风险和缓解风险的能力相结合,并考虑了风险缓解与时间之间的相关性。通过将其应用到实际的LHPC中,说明了该模型的合理性和可行性。仿真结果包括:RPDP分为三个阶段:风险首先轻微传播,风险然后呈指数爆发,最后传播后果将达到与利益相关者的抗风险能力紧密相关的稳定状态。在利益相关者的风险缓解能力和网络属性方面,RPDP范围随着合作伙伴数量的增加和合同价格分配的同质性而减小;在利益相关者的抗风险能力方面,RPDP范围随着合作伙伴数量的减少而减小。该研究可以作为分析和控制LHPC中延迟付款的有力补充。

著录项

  • 来源
    《Mathematical Problems in Engineering》 |2018年第8期|8013207.1-8013207.14|共14页
  • 作者单位

    Wuhan Univ, State Key Lab Water Resources & Hydropower Engn, Wuhan 430072, Hubei, Peoples R China;

    Wuhan Univ, Sch Water Resources & Hydropower Engn, Wuhan 430072, Hubei, Peoples R China;

    Yalong River Hydropower Dev Co Ltd, Chengdu 610051, Sichuan, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号