首页> 外文期刊>Materials and structures >Design and optimization of maintenance strategies for a long life-span port project
【24h】

Design and optimization of maintenance strategies for a long life-span port project

机译:使用寿命长的港口项目的维护策略设计和优化

获取原文
获取原文并翻译 | 示例

摘要

This paper deals with design and optimization of the maintenance works of reinforced concrete (RC) elements in a long life-span marine port in Shanghai, China. The deterioration model is established for the RC elements with prescribed durability limit state, and the failure probability evolution is calculated through Monte-Carlo simulations. Three maintenance levels are prescribed by failure probabilities at intervention. The preventive, necessary and mandatory maintenances correspond respectively to probability levels of 2, 5 and 20 %. Hereafter the cost model is built for the maintenance works of the port structure. With these available models, three schemes of maintenance planning are investigated: unsynchronized, synchronized and coating-synchronized schemes. For each scheme, all the three maintenance levels are considered. The cost analysis shows that the coating-synchronized scheme achieves the optimal cost by using surface coating to delay the deterioration rate of beam elements, and the necessary maintenance (Level 2) has always the lowest cost for all maintenance schemes. The coating-synchronized scheme with Level 2 maintenance is thus retained for the maintenance planning for RC elements in the marine port.
机译:本文针对中国长寿命海运港口的钢筋混凝土(RC)元件的维护工作进行设计和优化。建立了具有规定耐久性极限状态的钢筋混凝土构件的退化模型,并通过蒙特卡洛仿真计算了失效概率的演变。干预时的故障概率规定了三个维护级别。预防性维护,必要维护和强制维护分别对应于2%,5%和20%的概率水平。此后,将为港口结构的维护工作建立成本模型。利用这些可用的模型,研究了三种维护计划方案:非同步,同步和涂层同步方案。对于每种方案,都要考虑所有三个维护级别。成本分析表明,涂层同步方案通过使用表面涂层来延迟梁单元的劣化率来达到最佳成本,而必要的维护(级别2)始终是所有维护方案中成本最低的。因此,保留了具有2级维护功能的涂层同步方案,以用于海港RC元素的维护计划。

著录项

  • 来源
    《Materials and structures》 |2013年第2期|161-172|共12页
  • 作者单位

    Key Laboratory of Structure Safety and Durability of China Education Ministry, Department of Civil Engineering, Tsinghua University, Beijing 100084, People's Republic of China;

    Key Laboratory of Structure Safety and Durability of China Education Ministry, Department of Civil Engineering, Tsinghua University, Beijing 100084, People's Republic of China;

    Key Laboratory of Structure Safety and Durability of China Education Ministry, Department of Civil Engineering, Tsinghua University, Beijing 100084, People's Republic of China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    port structures; maintenance planning; chloride penetration; monte-carlo simulation; cost analysis;

    机译:港口结构;维护计划;氯化物渗透蒙特卡罗模拟成本分析;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号