首页> 外文期刊>Materials Research Innovations >High-speed railway's roadbed consolidation with fracture grouting in collapsible loess area: mechanism and application
【24h】

High-speed railway's roadbed consolidation with fracture grouting in collapsible loess area: mechanism and application

机译:黄土湿陷地区裂隙灌浆的高速铁路路基固结:机理与应用

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discussed the reasons and the harms of high-speed railway's roadbed settlement in collapsible loess area. On the basis of the experimental simulation and mechanical analysis, the mechanism of fracture grouting is concluded, and a set of upper grouting test equipment is developed as well. Through a set of tests under different grouting pressures, and analyses on the soil's mechanical properties and displacement variations, a quadratic approximation formula is gained. Meanwhile, the mechanism for fracture grouting and the validity of laboratory simulation is tested and verified. In addition, the effect of fracture grouting on high-speed railway's roadbed consolidation in collapsible loess area is also got by fieldqs trial. The results of the current paper provide guide and reference for studying fracture grouting in collapsible loess area.
机译:本文讨论了湿陷性黄土地区高速铁路路基沉降的原因和危害。在实验模拟和力学分析的基础上,总结了裂缝灌浆的机理,并开发了一套上层灌浆试验设备。通过一系列在不同灌浆压力下的试验,并分析了土壤的机械性能和位移变化,得出了二次近似公式。同时,对裂缝灌浆机理和实验室模拟的有效性进行了测试和验证。另外,通过现场试验也得到了裂缝注浆对湿陷性黄土地区高速铁路路基固结的影响。本文的研究结果为研究湿陷性黄土地区的裂缝灌浆提供了指导和参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号