...
首页> 外文期刊>Materials performance >Grist Mill Bridge Opens with New Composite Beams System
【24h】

Grist Mill Bridge Opens with New Composite Beams System

机译:Grist Mill Bridge打开新的复合梁系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In early 2021, AIT Bridges (Brewer, Maine, USA) announced that-in conjunction with the Maine Department of Transportation (MaineDOT) (Augusta, Maine, USA)-the replacement of Hamp-den's Grist Mill Bridge is complete, making the revamped road open to traffic. AIT Bridges is a division of Advanced Infrastructure Technologies (AIT), which designs and supplies composite bridge systems and related structural components. The former span of the Grist Mill Bridge was constructed in 1950, and it was comprised of three bridges built one on top of the other. However, the bridge had suffered from concrete deterioration, owing to years of exposure to the elements along with the use of deicing chemicals to combat Maine's harsh winter climate. The bridge spans over the Souadabscook Stream, which is an environmentally sensitive tributary of the Penobscot River.
机译:2021年初,AIT桥梁(Brewer,Maine,USA)宣布与缅因州缅因州(Aumedot)(Augusta,Maine,USA)结合使用 - 更换Hamp-Den的Grist Mill Bridge完整,使改变 道路通向交通。 AIT桥梁是高级基础设施技术(AIT)的部门,设计和提供复合桥系统和相关的结构部件。 麦克里斯厂桥的前跨度于1950年建造,它由三座桥组成,在另一个上面构成一个。 然而,由于使用除冰化学品来打击缅因州的严酷冬季气候,这座桥遭受了混凝土恶化,而且由于使用除冰化学物质而导致的元素。 这座桥梁跨越SouadaBscook溪流,这是一个环保景河的环保敏感的支流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号