Development and evaluation of a knowledge risk management model for project-based organizations A multi-stage study

机译:基于项目的组织的知识风险管理模型的开发和评估多阶段研究

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This paper seeks to develop a model for risk management of knowledge loss in a project-based organization in Iran. Design/methodology/approach - This study uses a multi-stage research approach. In the first stage, existing practices are examined to develop a model for risk management of knowledge loss. In the second stage, the model is evaluated by testing it in a case study. The methods integrated as the foundations of the Integrated KM and RM model are: the PMBOK risk management (RM) approach, the Fraunhofer IPK knowledge management (KM) model, and the TVA knowledge risk assessment framework. Findings - The analytical approach includes a six-step integrated model that manages the risk of critical knowledge in the case study. The results show that, after a year of implementing the model, the job positions facing knowledge loss were reduced by 88 percent. Research limitations/implications - The integrated KM and RM model can be used to assist the planning, establishment and evaluation of knowledge loss in projects. This helps to ensure that key issues regarding knowledge loss are covered during the planning and implementation phases of project management. Originality/value - This study provides an integrated perspective of KM in project-based organizations. It offers valuable guidelines that can help decision makers consider key issues during a risk assessment of knowledge factors in project management. Outputs of this model can prepare an extensive assessment report about the risk of knowledge loss in a project-based organization with suggestions for preservation plans to mitigate its effects.
机译:目的-本文旨在为伊朗基于项目的组织开发知识损失风险管理模型。设计/方法/方法-这项研究采用了多阶段研究方法。在第一阶段,将检查现有实践,以开发知识损失风险管理模型。在第二阶段,通过案例研究对模型进行评估。作为集成式KM和RM模型的基础而集成的方法有:PMBOK风险管理(RM)方法,Fraunhofer IPK知识管理(KM)模型和TVA知识风险评估框架。调查结果-分析方法包括一个六步集成模型,该模型可管理案例研究中关键知识的风险。结果表明,经过一年的实施,该模型面临的知识损失减少了88%。研究局限性/含义-集成的KM和RM模型可用于协助计划,建立和评估项目中的知识损失。这有助于确保在项目管理的计划和实施阶段涵盖有关知识损失的关键问题。原创性/价值-这项研究提供了基于项目的组织中KM的综合观点。它提供了有价值的指南,可以帮助决策者在项目管理中对知识因素进行风险评估时考虑关键问题。该模型的输出可以准备有关基于项目的组织中知识损失风险的广泛评估报告,并提供有关保留计划以减轻其影响的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号