...
首页> 外文期刊>Light Metals >Restart of 300kA Potlines after 5 Hours Power Failure
【24h】

Restart of 300kA Potlines after 5 Hours Power Failure

机译:停电5小时后重新启动300kA电位计

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A Chinese reduction plant has an installed capacity of 140 kt ofrnmetal per year and employs 180 pots with line current of 300kA.rnIn May, 2008, power failure happened. The situation lasted 5rnhours. The bath temperatures fell to 900℃ below. Power wasrnswitched on after recovering the power system. At the initial stagernof restart the anode effect frequency was high. The voltage andrnamperage of lines fluctuated severely, which caused higher anoderneffects. Rectiformer failure would have occurred in such arnsituation. We finally solved the problems and led the lines to thernnormal status. The paper discusses the strategies adopted; restartrnoperations and the technological parameter normalization duringrnrestart.
机译:一家中国的还原厂每年的装机容量为140 kt金属,使用180个罐,线路电流为300kA。rn在2008年5月,发生了电源故障。局势持续了5个小时。浴温降至900℃以下。恢复电源系统后,电源被打开。在初始阶段,阳极重启频率很高。线路的电压和电流波动严重,导致较高的阳极效应。在这种情况下会发生整流器故障。我们终于解决了这些问题,并使生产线恢复到正常状态。本文讨论了采用的策略;重新启动操作和重新启动过程中的技术参数归一化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号