首页> 外文期刊>Landslides >Qualitative risk assessment schemes using selected parameters for hillslope developments: a case study of Penang Island
【24h】

Qualitative risk assessment schemes using selected parameters for hillslope developments: a case study of Penang Island

机译:使用选定参数进行坡地开发的定性风险评估方案:以槟城岛为例

获取原文
获取原文并翻译 | 示例
           

摘要

Development of hilly areas requiring deforestation and increased human activities has raised many environmental issues in the world. This paper presents the results of investigation to assess the parameters that contribute to the risk to environment by reviewing available reports from Penang Island and surrounding areas. Nine parameters were identified that mostly contribute to the environmental risk. These are casualties of people, soil properties, earth coverage, soil grading characteristics, land use suitability, factor of safety, blasting area, distance between proposed structure to slope and geometry of slope. From these parameters, the rated risk approaches were proposed based on the prediction of occurrences of environmental issues. The rated risks were categorised from very high (5) to very low (1) with high, medium and low in between. The assessments were reviewed and evaluated based on rated risk for the chosen parameters. A map was developed identifying areas of environmental risk. The map can be used to quantify risk to the environment based on the parameters due to the proposed development. The overall result shows that areas PD3 of Tanjung Bungah and PD3, PD8 and PD9 of Paya Terubong have high-rated risk. No development area is classified as very high risk and very low-risk areas. These rating approaches can be used to develop potential risk zoning of proposed development areas. From this zoning guideline or standard, the viability of any proposed development can be measured.
机译:在需要砍伐森林和增加人类活动的丘陵地区的发展引起了世界上许多环境问题。本文介绍了调查结果,以通过回顾槟城岛及周边地区的现有报告来评估对环境造成危害的参数。确定了九个主要影响环境风险的参数。这些是人员伤亡,土壤性质,土地覆盖率,土壤等级特征,土地用途的适用性,安全系数,爆破面积,拟建结构与斜坡之间的距离以及斜坡的几何形状。从这些参数出发,基于对环境问题的预测,提出了额定风险方法。评级风险从极高(5)到极低(1)分为高,中和低。根据所选参数的额定风险对评估进行审查和评估。绘制了地图,确定了环境风险区域。由于拟议的开发,该图可用于基于参数量化对环境的风险。总体结果显示,Tanjung Bungah的PD3区域和Paya Terubong的PD3,PD8和PD9区域具有较高的风险等级。没有开发区域被归类为高风险和低风险区域。这些评估方法可用于开发拟议开发区域的潜在风险分区。根据该分区指南或标准,可以衡量任何拟议开发项目的可行性。

著录项

  • 来源
    《Landslides》 |2012年第1期|p.63-74|共12页
  • 作者单位

    School of Civil Engineering, University of Science Malaysia, 14300, Nibong Tebal, P. Pinang, Malaysia;

    School of Civil Engineering, University of Science Malaysia, 14300, Nibong Tebal, P. Pinang, Malaysia;

    Department of Civil Engineering, Jubail University College, Jubail Industrial City, 31961, Saudi Arabia;

    School of Civil Engineering, University of Science Malaysia, 14300, Nibong Tebal, P. Pinang, Malaysia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Environmental risk assessment; Risk parameters; Rating classification; GIS;

    机译:环境风险评估风险参数评级分类GIS;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号