The process the Town of Durham followed saved it time and money.rn"It's sort of unheard of for a municipality doing its own design-build project. A lot of it has to do with purchasing policies and state regulations," offered the town's Dave Cedarholm. "When we're doing a sewer or a water project with a grant, we are required to hire an engineer to design and oversee the construction of the project and then we have to bid the project out.
展开▼