首页> 外文期刊>Knowledge-Based Systems >Hierarchical task network planning with resources and temporal constraints
【24h】

Hierarchical task network planning with resources and temporal constraints

机译:具有资源和时间约束的分层任务网络计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Planning problems in many real-world areas are characterized by the involvement of various types of resources and complex temporal and functional relationships among numerous tasks. Hierarchical Task Network (HTN) planning is suitable for large-scale practical planning problems due to its hierarchical task decomposition principle and expressiveness for domain knowledge representation. In this paper, we propose an HTN planning algorithm named GSCCB-SHOP2 to handle multi-capacity discrete resources and complex temporal constraints simultaneously during planning. The algorithm integrates three carefully designed and interrelated sub-modules. First, the Resource model realizes resource reasoning with the designed state updating rules. Second, the Check Consistency and Backtrack (CCB) module is designed to determine temporal constraints and maintain the consistency of those constraints. Third, the Guide Search (GS) module is designed to improve the resource utilization and thus shorten the makespan performance of the generated action plan. Experimental studies are conducted to verify the efficiency of the proposed algorithm. (C) 2017 Elsevier B.V. All rights reserved.
机译:许多现实世界中的计划问题的特征是涉及各种类型的资源以及众多任务之间复杂的时间和功能关系。分层任务网络(HTN)计划由于其分层任务分解原则和领域知识表示的可表达性而适合于大规模的实际计划问题。在本文中,我们提出了一种称为GSCCB-SHOP2的HTN规划算法,以在规划过程中同时处理多容量离散资源和复杂的时间约束。该算法集成了三个精心设计且相互关联的子模块。首先,资源模型利用设计的状态更新规则实现资源推理。其次,检查一致性和回溯(CCB)模块旨在确定时间约束并保持这些约束的一致性。第三,指南搜索(GS)模块旨在提高资源利用率,从而缩短生成的行动计划的有效期性能。进行实验研究以验证所提出算法的效率。 (C)2017 Elsevier B.V.保留所有权利。

著录项

  • 来源
    《Knowledge-Based Systems》 |2017年第1期|17-32|共16页
  • 作者单位

    Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Hubei, Peoples R China|Huazhong Univ Sci & Technol, Sch Automat, Wuhan 430074, Hubei, Peoples R China|Huazhong Univ Sci & Technol, Minist Image Proc & Intelligent Control, Key Lab Educ, Wuhan 430074, Hubei, Peoples R China;

    Univ Waterloo, David R Cheriton Sch Comp Sci, Waterloo, ON N2L 3G1, Canada;

    Lehigh Univ, Comp Sci & Engn, 19 Mem Dr West, Bethlehem, PA 18015 USA;

    Huazhong Univ Sci & Technol, Sch Automat, Wuhan 430074, Hubei, Peoples R China|Huazhong Univ Sci & Technol, Minist Image Proc & Intelligent Control, Key Lab Educ, Wuhan 430074, Hubei, Peoples R China;

    Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Hubei, Peoples R China|Huazhong Univ Sci & Technol, Sch Automat, Wuhan 430074, Hubei, Peoples R China|Huazhong Univ Sci & Technol, Minist Image Proc & Intelligent Control, Key Lab Educ, Wuhan 430074, Hubei, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Task planning; Hierarchical task networks; Multi-capacity discrete resource; Temporal constraint;

    机译:任务计划;分层任务网络;多容量离散资源;时间约束;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号