首页> 外文期刊>Key Engineering Materials >The Key Technology Of Skew Continuous Prestressed Concrete Box Girder Bridges With Incremental Launching Method
【24h】

The Key Technology Of Skew Continuous Prestressed Concrete Box Girder Bridges With Incremental Launching Method

机译:渐进式斜交连续预应力混凝土箱梁桥关键技术

获取原文
获取原文并翻译 | 示例
       

摘要

Incremental launching method is a construction technology for prestressed concrete continuous bridges widely used in China. In the incremental launching method, the superstructure of a bridge is erected from one side of bridge longitudinally to the opposite bank. Compared with other technology for bridge erection methods, it may reduce the cost of labor, shorten the construction period and save the assembly yard. So it is a competitive construction method for medium-span prestressed concrete continuous bridges. A large number of skew bridges will be built especially at mountain area, so it is very necessary to research on incrementally launching method for skew bridges. The objective of the study presented in this paper is to introduce the method used in the Lishui Bridge in Zhangjiajie city of China.
机译:增量发射法是一种在中国广泛使用的预应力混凝土连续桥的施工技术。在渐进式发射方法中,桥梁的上部结构从桥梁的一侧纵向竖立到相对的堤岸。与其他桥梁安装技术相比,它可以减少人工成本,缩短施工周期并节省装配场地。因此,它是中跨预应力混凝土连续桥的一种竞争性施工方法。特别是在山区,将建造大量的斜交桥,因此有必要研究斜交桥的渐进式发射方法。本文提出的研究目的是介绍在中国张家界市丽水大桥上使用的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号