首页> 外文期刊>Key Engineering Materials >Study of Risk Evaluation System of High Arch Dam Based on Failure Mechanism
【24h】

Study of Risk Evaluation System of High Arch Dam Based on Failure Mechanism

机译:基于破坏机理的高拱坝风险评估系统研究

获取原文
获取原文并翻译 | 示例
           

摘要

In view of the randomness in terms of high arch dam load, resistance and failure calamity loss as well as the fuzziness in terms of evaluation conclusion, a high arch dam risk evaluation system is established by means of risk analysis method. Natural factors, structural factors and human factors that lead to high arch dam failure are summed up on the basis of statistics. Through qualitative analysis coupled with quantitative estimation, it is determined that high arch dams generally involve five major failure modes: abutment rock mass destabilization, excess cracking, arch dam & dam foundation entire destabilization, extreme dam-overflow and destabilization of dam body along base plane. The state functions of individual major failure modes are established. An approach is made to the correlativity among the major failure modes and among the random variables within individual failure modes, and it is suggested that risk rate, economic loss risk value and life loss risk value should be used to assess the risk of high arch dams. A certain high arch dam abutment instability risk evaluation has been provided.
机译:鉴于高拱坝荷载的随机性,抵抗力和破坏性灾害的损失以及评估结论的模糊性,采用风险分析方法建立了高拱坝风险评估体系。在统计的基础上,总结了导致高拱坝溃坝的自然因素,结构因素和人为因素。通过定性分析和定量估计,确定高拱坝一般涉及五种主要破坏模式:基台岩体失稳,过度开裂,拱坝和坝基整体失稳,极端坝溢流和沿基体的坝体失稳。 。建立了各个主要故障模式的状态功能。研究了主要破坏模式之间以及各个破坏模式内随机变量之间的相关性,并建议使用风险率,经济损失风险值和生命损失风险值来评估高拱坝的风险。 。已经提供了一定的高拱坝基台失稳风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号