首页> 外文期刊>Journal of thermal stresses >COMPUTATION OF THERMAL-STRESSES AND CONTRACTION JOINT DISTANCE OF RCC DAMS
【24h】

COMPUTATION OF THERMAL-STRESSES AND CONTRACTION JOINT DISTANCE OF RCC DAMS

机译:碾压混凝土坝热应力和收缩缝距离的计算

获取原文
获取原文并翻译 | 示例
       

摘要

A new approach in 3D numerical modeling for unsteady phased thermal-stress analysis of a massive concrete hydraulic structure is presented. The temperature field is computed first, providing a drive for the unsteady, nonlinear, viscoelastic, stress-strain analysis. This model is devised with actual initial and boundary conditions, appropriate material properties, and the observed concrete placement schedule. The verification is based on the field investigations of the Platanovryssi dam. The results of a long-term analysis have shown close agreement with the observed dam conditions. The proposed model presents a reliable tool for thermal-stress computation and transverse contraction joint distance evaluation.
机译:提出了一种用于大型混凝土水工结构非稳态分阶段热应力分析的3D数值建模新方法。首先计算温度场,为非稳态,非线性,粘弹性,应力应变分析提供动力。该模型是根据实际的初始条件和边界条件,适当的材料特性以及观察到的混凝土浇筑计划而设计的。验证基于Platanovryssi大坝的现场调查。长期分析的结果表明,与所观察到的大坝状况密切相关。提出的模型为热应力计算和横向伸缩缝距离评估提供了可靠的工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号