首页> 外文期刊>The Journal of Systems and Software >An empirical analysis of risk components and performance on software projects
【24h】

An empirical analysis of risk components and performance on software projects

机译:对软件项目中的风险成分和性能的实证分析

获取原文
获取原文并翻译 | 示例
           

摘要

Risk management and performance enhancement have always been the focus of software project management studies. The present paper shows the findings from an empirical study based on 115 software projects on analyzing the probability of occurrence and impact of the six dimensions comprising 27 software risks on project performance. The MANOVA analysis revealed that the probability of occurrence and composite impact have significant differences on six risk dimensions. Moreover, it indicated that no association between the probability of occurrence and composite impact among the six risk dimensions exists and hence, it is a crucial consideration for project managers when deciding the suitable risk management strategy. A pattern analysis of risks across high, medium, and low-performance software projects also showed that (1) the "requirement" risk dimension is the primary area among the six risk dimensions regardless of whether the project performance belongs to high, medium, or low; (2) for medium-performance software projects, project managers, aside from giving importance to "requirement risk", must also continually monitor and control the "planning and control" and the "project complexity" risks so that the project performance can be improved; and, (3) improper management of the "team", "requirement", and "planning and control" risks are the primary factors contributing to a low-performance project. (C) 2006 Elsevier Inc. All rights reserved.
机译:风险管理和性能增强一直是软件项目管理研究的重点。本文展示了一项基于115个软件项目的实证研究的结果,该实证研究分析了包含27个软件风险的六个方面对项目绩效的发生和影响的概率。 MANOVA分析显示,发生的可能性和综合影响在六个风险维度上有显着差异。而且,它表明六个风险维度之间的发生概率与综合影响之间不存在关联,因此,在确定合适的风险管理策略时,这是项目经理的关键考虑因素。对高,中,低性能软件项目进行的风险模式分析还显示:(1)“需求”风险维度是六个风险维度中的主要领域,无论项目绩效是属于高,中还是中。低; (2)对于中等性能的软件项目,项目经理除了重视“需求风险”外,还必须持续监控“计划与控制”和“项目复杂性”风险,以提高项目绩效。 ; (3)对“团队”,“需求”和“计划与控制”风险的不当管理是导致低绩效项目的主要因素。 (C)2006 Elsevier Inc.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号