...
首页> 外文期刊>Journal of supercomputing >Resource levelling problem in construction projects under neutrosophic environment
【24h】

Resource levelling problem in construction projects under neutrosophic environment

机译:中智环境下建设项目的资源均衡问题

获取原文
获取原文并翻译 | 示例

摘要

Planning and managing resources is one of the most important topics in project management science. Resource leveling is used for improving work efficiency and minimizing cost throughout the life of the project. Fuzzy resource leveling models assume only truth-membership functions to deal uncertainties conditions surrounded by the projects and their activities duration. In this paper, we consider the objective function of scheduling problem is to minimize the costs of daily resource fluctuations using the precedence relationships during the project completion time. We design a resource leveling model based on neutrosophic set to overcome the ambiguity caused by the real-world problems. In this model, trapezoidal neutrosophic numbers are used to estimate the activities durations. The crisp model for activities time is obtained by applying score and accuracy functions. A numerical example is developed to illustrate the validation of the proposed model in this study.
机译:计划和管理资源是项目管理科学中最重要的主题之一。资源平衡用于提高项目整个生命周期内的工作效率并最小化成本。模糊资源均衡模型仅假设真值成员函数来处理项目及其活动持续时间所包围的不确定性条件。在本文中,我们认为调度问题的目标功能是使用项目完成期间的优先关系使日常资源波动的成本最小化。我们设计了基于中智集的资源均衡模型,以克服由现实世界中的问题引起的歧义。在此模型中,梯形中智数用于估计活动持续时间。通过应用得分和准确性函数可以获得活动时间的清晰模型。数值例子说明了本研究中提出的模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号