首页> 外文期刊>Journal of statistical computation and simulation >Identifying the time of a step change with multivariate single control charts
【24h】

Identifying the time of a step change with multivariate single control charts

机译:使用多元单一控制图确定步骤更改的时间

获取原文
获取原文并翻译 | 示例
       

摘要

Change point estimation procedures simplify the efforts to search for and identify special causes in multivariate statistical process monitoring. After a signal is generated by the simultaneously used control charts or a single control chart, add-on change point procedure estimates the time of the change. In this study, multivariate joint change point estimation performance for simultaneous monitoring of both location and dispersion is compared under the assumption that various single charts are used to monitor the process. The change detection performance for several structural changes for the mean vector and covariance matrix is also discussed. It is concluded that choice of the control chart to obtain a signal may affect the change point detection performance.
机译:变更点估计程序简化了在多元统计过程监视中搜索和识别特殊原因的工作。在同时使用的控制图或单个控制图生成信号之后,附加的更改点过程将估计更改时间。在这项研究中,在假设使用各种单个图表监视过程的情况下,比较了同时监视位置和离散度的多变量联合变化点估计性能。还讨论了均值向量和协方差矩阵的几种结构变化的变化检测性能。结论是,选择控制图以获得信号可能会影响变化点检测性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号