首页> 外文期刊>Journal of Scheduling >A faster polynomial algorithm for 2-cyclic robotic scheduling
【24h】

A faster polynomial algorithm for 2-cyclic robotic scheduling

机译:2周期机器人调度的快速多项式算法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper addresses the 2-cyclic identical part scheduling in a no-wait robotic flowshop where exactly two parts enter and two parts leave the production line during each cycle. This problem was previously proved to be polynomially solvable in O(N~8 log N) time, where iV is the number of tanks in the production line. This paper proposes an improved algorithm with reduced complexity O(N~5 log N).
机译:本文介绍了在无等待机器人流程车间中的2周期相同零件计划,其中每个周期中恰好有两个零件进入生产线,两个零件离开生产线。先前已证明此问题可以在O(N〜8 log N)时间内多项式解决,其中iV是生产线中的储罐数量。提出了一种改进算法,降低了复杂度O(N〜5 log N)。

著录项

  • 来源
    《Journal of Scheduling》 |2006年第5期|453-468|共16页
  • 作者

    Chengbin Chu;

  • 作者单位

    Institut Charles Delaunay, Universite de Technologie de Troyes,FRE CNRS 2848, Laboratoire d'optimisation des systemes industriels (LOSI),12 rue Marie Curie-BP 2060, 10010 Troyes Cedex, France School of Management, Hefei University of Technology, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    cyclic scheduling; hoist scheduling; no-wait flowshop; polynomial algorithm; complexity;

    机译:循环调度;提升计划;无需等待的流水车间;多项式算法复杂;
  • 入库时间 2022-08-17 13:16:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号