Equipment Location in Machining Transfer Lines with Multi-spindle Heads

机译:多主轴头加工传输线中的设备位置

获取原文
获取原文并翻译 | 示例

摘要

The considered problem appears when a machining line must be configured. It is necessary to define the number of workstations and the number of spindle heads at each workstation to be put in the line in order to produce a given part. This problem is known to be (mathcal{NP})-hard and, as a consequence, the solution time increases exponentially with the size of the problem. A number of pre-processing procedures are suggested in this article in order to decrease the initial problem size and thus shorten the solution time. A new algorithm for calculating a lower bound on the number of required equipment is also presented. A numerical example is given.
机译:当必须配置加工线时,出现所考虑的问题。为了生产给定的零件,必须定义工作站的数量和要放入生产线的每个工作站的主轴头的数量。已知此问题很难解决(数学{NP}),因此,解决时间随问题的大小呈指数增长。本文建议了许多预处理程序,以减小初始问题的大小,从而缩短解决时间。还提出了一种用于计算所需设备数量下限的新算法。给出了一个数值例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号