...
首页> 外文期刊>Journal of Management in Engineering >Using Best-Value Procurement to Measure the Impact of Initial Risk-Management Capability on Qualitative Construction Performance
【24h】

Using Best-Value Procurement to Measure the Impact of Initial Risk-Management Capability on Qualitative Construction Performance

机译:使用最佳价值采购来衡量初始风险管理能力对定性施工绩效的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Managing project risk in construction is becoming increasingly critical for ensuring that project objectives are met effectively. Perceptions and practices related to effective risk management vary among contractors, which results in different levels of risk-management capabilities. A best-value selection method enables owners to identify, during the selection process, contractors with strong risk-management capabilities. This paper presents qualitative data from 133 construction projects in which contractors were selected through a best-value process. During the selection process, contractors completed a risk-management plan (RMP) in which they identified the major risks of prospective projects and ways to manage the risks. The RMPs were then scored by a group of reviewers, and the scores for each contractor were averaged and used within the best-value selection model. In addition, after completion of each project, a close-out survey was used to gather data on several aspects of the contractors' project performance. A contractor's average RMP score and survey data were examined with Pearson's product-moment correlation and linear regression analysis. A positive correlation was found between average RMP scores and the performance metrics assessed in the survey. Contractors with high average RMP scores also had achieved high levels in the performance metrics of quality, professionalism, risk communication, and overall customer satisfaction. An additional correlation was found between average RMP scores and project award percentage. These correlations highlight the importance of establishing and developing effective project risk-management methods and selecting vendors through a best-value approach. (C) 2017 American Society of Civil Engineers.
机译:在建设中管理项目风险对于确保有效实现项目目标变得越来越重要。承包商之间对有效风险管理的看法和做法各不相同,这导致了不同级别的风险管理能力。最佳价值选择方法使所有者能够在选择过程中识别具有强大风险管理能力的承包商。本文提供了来自133个建设项目的定性数据,这些项目是通过最佳价值过程选择承包商的。在选择过程中,承包商完成了一项风险管理计划(RMP),其中他们确定了预期项目的主要风险以及管理风险的方法。然后由一组审阅者对RMP进行评分,并对每个承包商的评分取平均值,并在最佳价值选择模型中使用。此外,在每个项目完成之后,使用封闭调查进行调查,以收集有关承包商项目绩效的多个方面的数据。承包商的平均RMP得分和调查数据通过Pearson的产品矩相关性和线性回归分析进行了检查。在调查中评估的RMP平均得分与绩效指标之间发现正相关。 RMP平均得分高的承包商在质量,专业性,风险沟通和整体客户满意度的绩效指标上也达到了很高的水平。在平均RMP分数和项目奖励百分比之间发现了其他相关性。这些相关性突出了建立和开发有效的项目风险管理方法以及通过最佳价值方法选择供应商的重要性。 (C)2017年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号