Integrating the Input of Stakeholders in Infrastructure Risk Assessment

机译:将利益相关者的意见整合到基础架构风险评估中

获取原文
获取原文并翻译 | 示例
       

摘要

Dynamics associated with the involvement of multiple stakeholders with conflicting objectives often result in significant delays and cost overruns. Lack of a systematic approach to integrate input of a wide range of stakeholders in infrastructure planning results in the neglect of interactional dynamics and can overshadow the accuracy of project schedules and estimates. To address this lack, a systematic approach based on risk assessment is presented in this paper to gauge the relative impact of interactions on project outcomes based on the input of a wide range of stakeholders. With the primary objective of facilitating the input of stakeholders in infrastructure planning, the proposed approach aims to help project developers define and characterize the network of stakeholders in a specific project phase, assess relative importance of risks associated with the interactions based on the fuzzified input of a wide range of stakeholders, and integrate the results of the assessment into the project plans using social network analysis. A case study considering the preconstruction and construction phases of nuclear power plants was used to demonstrate the application of the proposed approach. High interactional risk levels were observed in various degrees of involvement, highlighting the high risk of overlooking actors with a low degree of involvement, such as the general public or a regulatory agency, in project planning. The results further indicate the dynamic nature of interactions in a project's lifetime because degrees of significance for stakeholder interactions changed in different phases of the project.
机译:与目标相互冲突的多个利益相关者的参与相关的动态通常会导致严重的延误和成本超支。缺乏将广泛的利益相关者的投入整合到基础设施规划中的系统方法导致对交互动力学的忽视,并可能使项目进度表和估算的准确性黯然失色。为了解决这一不足,本文提出了一种基于风险评估的系统方法,以根据众多利益相关者的意见来评估交互作用对项目成果的相对影响。旨在促进利益相关者在基础设施规划中的投入的主要目的,该提议的方法旨在帮助项目开发人员在特定项目阶段定义和表征利益相关者的网络,基于模糊的投入评估与交互相关的风险的相对重要性。广泛的利益相关者,并使用社交网络分析将评估结果整合到项目计划中。案例研究考虑了核电厂的预建阶段和建设阶段,以论证该方法的应用。在不同程度的参与中都观察到较高的交互风险水平,这突出表明了在项目规划中忽视参与度较低的参与者(例如,公众或监管机构)的高风险。结果进一步表明了交互作用在项目生命周期中的动态性质,因为利益相关者交互作用的重要性程度在项目的不同阶段中发生了变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号