【24h】

EXTREME WIND LOADS ON SUPER-LARGE COOLING TOWERS

机译:超大型冷却塔上的极大风荷载

获取原文
获取原文并翻译 | 示例

摘要

A 1:600 reduced-scale model with simultaneous external and internal pressure measurements of a 215 m high cooling tower was designed and tested. The model was immersed in flows with several different turbulence intensities which were simulated in a multiple-fan actively-controlled wind tunnel to obtain time histories of resultant pressures. An estimation method of extreme wind load based on the correlation concept and the peak factor with a specified exceeding probability was proposed to analyze the extreme value characteristics under the condition of different turbulence intensities of the incoming flows. Six wind load patterns were proposed to fit the extreme wind loads, the results show that the combination of extreme external pressure and mean internal pressure is the most suitable.
机译:设计并测试了1:1m缩小模型,同时测量了215 m高冷却塔的内部和外部压力。将模型浸没在具有几种不同湍流强度的流中,然后在多风扇主动控制的风洞中对其进行仿真,以获得合成压力的时间历程。提出了一种基于相关性概念和具有超过指定概率的峰值因子的极端风荷载估计方法,以分析入流湍流强度不同时的极值特征。提出了六种风荷载模式以适应极端风荷载,结果表明,极端外部压力和平均内部压力的组合是最合适的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号