首页> 外文期刊>Journal of Infrastructure Systems >Analyzing Configurational Paths for Successful PPPs in Indian Urban Drinking Water Sector
【24h】

Analyzing Configurational Paths for Successful PPPs in Indian Urban Drinking Water Sector

机译:在印度城市饮用水部门成功PPP分析配置路径

获取原文
获取原文并翻译 | 示例
           

摘要

Over the last three decades, public-private partnership projects have emerged as strong alternative service delivery mechanisms to conventional public sector initiatives. The results, however, have been a mix of failures and successes. The determinants of success and failure of such arrangements have generated much interest among stakeholders and the research community, but the combinations of factors that influence the success of public-private partnership projects are relatively less researched. This article investigates the relationships among the complex factors that influence the success of such arrangements, using urban drinking water projects in India as an example. Eighteen projects were selected for the study and 11 factors affecting the project outcome (causal conditions) were identified based on the literature review. Fuzzy set qualitative comparative analysis was conducted to understand which combinations of causal conditions potentially influence the outcome of a public-private partnership project. The analysis identified five causal solutions comprising seven to nine causal conditions each. Defining service standards in a manner that is amenable to measurement and public disclosure emerged as a necessary condition. Two causal solutions presented themselves with capacity of the public sector, and its consequent outputs, as a primary theme. Two other solutions have elements relating to appropriate project structure and baseline information as the key causal conditions. These causal solutions indicate the interrelationship between various factors that influence project performance and provide pointers for project proponents to focus on the causal conditions over which they have relatively better control, when configuring public-private partnership projects.
机译:在过去的三十年中,公私伙伴关系项目已成为传统公共部门倡议的强有力的替代服务交付机制。然而,结果一直是失败和成功的混合。这种安排成功和失败的决定因素在利益攸关方和研究界之间产生了很大的利益,但影响公私伙伴关系项目成功的因素的组合相对较少。本文调查了影响这些安排成功的复杂因素之间的关系,以印度的城市饮用水项目为例。选择了十八个项目,为研究,影响项目结果(因果条件)的11个因素是根据文献审查确定的。进行了模糊集的定性比较分析,了解因果条件的哪种组合可能影响公私伙伴关系项目的结果。该分析确定了五种因果溶液,每个因果解决方案包括七至九个因果条件。以可作为必要条件的测量和公开披露的方式定义服务标准。两个因果解决方案呈现出公共部门的能力,其后果产出为主要主题。另外两种解决方案具有与适当的项目结构和基线信息有关的元素,作为关键因果条件。这些因果解决方案表示影响项目绩效的各种因素之间的相互关系,并为项目支持者提供指针,专注于在配置公私伙伴关系项目时对其进行控制的因果条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号