...
首页> 外文期刊>Journal of Information & Optimization Sciences >Modified Imperfect Economic Manufacturing Quantity Model with Limited Investment Capital
【24h】

Modified Imperfect Economic Manufacturing Quantity Model with Limited Investment Capital

机译:投资资本有限的修正的不完全经济制造业数量模型

获取原文
获取原文并翻译 | 示例

摘要

Traditional economic manufacturing quantity model assumes that the perfect product for production. Recently, Teng proposes an imperfect production process with limited investment capital for determining the optimal investment cost and production run time. Teng assumes that the percentage of process defectives with uniform distribution is a decreasing function of the investment cost. However, Teng's model does not include the customer's used cost for the conforming product. In this study, the authors adopt another investment cost function, i.e., the exponential reduction of process mean and standard deviation as the function of quality investment cost, for formulating the modified Teng's model. Taguchi's quadratic quality loss will be used for measuring the product quality. Finally, the numerical example and sensitivity analysis of parameters are provided for illustration.
机译:传统的经济制造数量模型假定生产的理想产品。最近,Teng提出了一种投资资本有限的不完善生产流程,用于确定最佳投资成本和生产运行时间。 Teng认为具有均匀分布的工艺缺陷的百分比是投资成本的递减函数。但是,Teng的模型不包括客户用于合格产品的使用成本。在这项研究中,作者采用了另一种投资成本函数,即过程均值和标准差的指数减少作为质量投资成本的函数,以建立改进的滕氏模型。田口的二次质量损失将用于测量产品质量。最后,通过数值算例和参数敏感性分析进行说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号