首页> 外文期刊>Journal of Environmental Sciences >Optimum operation conditions of nitrogen and phosphorus removal by a biofilm-activated-sludge system
【24h】

Optimum operation conditions of nitrogen and phosphorus removal by a biofilm-activated-sludge system

机译:生物膜活化污泥系统脱氮除磷的最佳操作条件

获取原文
获取原文并翻译 | 示例
           

摘要

In the biofilm and activated sludge combined system, denitrifying bacteria attached on the fibrous carriers in the anoxic tank, while the sludge containing nitrifying and phosphorus removal bacteria was only recirculated between the aerobic and anaerobic tanks. Therefore, the factors affected and restricted nitrification, denitrification and phosphorus removal in a traditional A/A/O process were resolved. This paper describes the optimum operation conditions for nitrogen and phosphorus removal using this system.
机译:在生物膜和活性污泥联合系统中,反硝化细菌附着在缺氧池中的纤维载体上,而含有硝化和除磷细菌的污泥仅在需氧池和厌氧池之间再循环。因此,解决了传统A / A / O工艺中影响和限制硝化,反硝化和除磷的因素。本文介绍了使用该系统脱氮除磷的最佳操作条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号