...
首页> 外文期刊>Journal of Environment & Development >Hydroelectric Development and Road Paving in Brazil's Transamazon Area
【24h】

Hydroelectric Development and Road Paving in Brazil's Transamazon Area

机译:巴西Transamazon地区的水力发电开发和道路铺装

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

There are renewed signs that the Brazilian government has retaken the path of large-scale development in the Amazon and that the strategy has been defined with practically no input from society. Among many other development proj- ects for the region, the federal government recently announced two new proj- ects that will profoundly affect the Transamazon Highway area around the town of Altamira. One of the projects is the development of a major hydroelec- tric power plant on the Xingu River (Belo Monte) and the other is the paving of the Transamazon between the towns of Maraba and Altamira in eastern Ama- zonia.
机译:有新的迹象表明,巴西政府已经走上了亚马逊地区大规模发展的道路,并且该战略的定义几乎没有社会的投入。在该地区的许多其他发展项目中,联邦政府最近宣布了两项新项目,这些项目将深刻影响阿尔塔米拉镇周围的Transamazon公路地区。其中一个项目是在新古河(贝洛蒙特)上开发一个大型水力发电厂,另一个项目是在亚马逊东部马拉巴镇和阿尔塔米拉镇之间铺设Transamazon。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号