首页> 外文期刊>Journal of engineering mathematics >Mud removal and cement placement during primary cementing of an oil well
【24h】

Mud removal and cement placement during primary cementing of an oil well

机译:油井初次固井过程中泥浆的清除和固井

获取原文
获取原文并翻译 | 示例
           

摘要

A two-dimensional model is derived of the displacement flow that occur during primary cementing of oil and gas wells. The displacement geometry is a long narrow eccentric annulus, between the casing and the rock formation. The model consists of a series of first-order convection equations for the fluid concentrations and a quasi-linear Poisson-type equation for the stream function. Coupling is through the velocity field and the concentration-dependent fluid properties. A range of computed results from this model is presented. One simulation illustrates how a channel of mud Can be left behind on the narrow side of the annulus.
机译:推导了油气井初次固井过程中发生的位移流的二维模型。位移几何形状是在套管和岩层之间的一个长而窄的偏心环。该模型由用于流体浓度的一系列一阶对流方程和用于流函数的准线性泊松型方程组成。耦合是通过速度场和与浓度有关的流体特性进行的。给出了该模型的一系列计算结果。一种模拟显示了如何在环的狭窄侧留下一条泥浆通道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号