首页> 外文期刊>Journal of Construction Engineering and Management >Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms
【24h】

Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms

机译:减少施工企业实施企业风险管理的障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Although enterprise risk management (ERM) has been advocated in the construction industry, its implementation is still plagued with hindrances. The objectives are to identify the critical hindrances to ERM implementation in Chinese construction firms (CCFs) and investigate the interrelationships among these critical hindrances. To achieve the objectives, 36 hindrances were identified through a literature review and a questionnaire survey was performed with 119 respondents. The results indicated that 20 hindrances were deemed critical, among which insufficient resources (e.g., time, money, and people) was ranked top. Additionally, the critical hindrances were categorized into lack of relevant resources and procedures (LRRP), lack of senior-level support and leadership (LSSL), and lack of high-quality data (LHQD). LSSL contributed to LRRP, whereas LRRP resulted in LHQD. The managerial implications drawn from these results can help the management take measures to overcome them. Although this study is focused on CCFs, other firms may use the identified hindrances and follow the method to prepare their customized list of hindrances.
机译:尽管在建筑行业中一直提倡企业风险管理(ERM),但其实施仍然遇到障碍。目的是确定在中国建筑公司(CCF)中实施企业风险管理的关键障碍,并研究这些关键障碍之间的相互关系。为了实现这些目标,通过文献综述确定了36个障碍,并对119名受访者进行了问卷调查。结果表明,有20种障碍被认为是至关重要的,其中资源不足(例如时间,金钱和人手)排在首位。此外,严重的障碍归类为缺乏相关资源和程序(LRRP),缺乏高层支持和领导(LSSL)以及缺乏高质量数据(LHQD)。 LSSL促成了LRRP,而LRRP促成了LHQD。从这些结果中得出的管理含义可以帮助管理层采取措施克服这些问题。尽管本研究的重点是CCF,但其他公司可能会使用已发现的障碍并遵循该方法来准备自己的障碍列表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号