Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs

机译:考虑运营和租赁成本的塔式起重机的位置优化和建筑工地的材料供应点分配

获取原文
获取原文并翻译 | 示例
           

摘要

The choice of a suitable tower crane along with its location may considerably affect the costs and duration of the construction process. The location of the tower crane determines the travel time of transporting material between the supply and demand points and thus the operation costs. On the other hand, the distance between the tower crane and supply points as well as the distance between the tower crane and demand points considerably affects the minimum required load moment capacity of the cranes and thus the cranes' rental and operating costs. Previous studies on optimizing the location of tower cranes on a construction site have focused mainly on minimizing the crane operation costs through minimizing their operation time, overlooking the effect of tower crane location on its required capacity and thus rental and operation costs. This paper presents a modified crane location optimization model that also accounts for the effects of crane location on its required capacity, on top of operating time, when minimizing the total costs of lifting operations. A mixed-integer programming model is developed and applied to an actual case study to illustrate the importance of accounting for the effect of crane location on its required capacity in crane location optimization. Furthermore, using a hypothetical case study, the presence of substantial differences between the weights of the elements required at different demand points is identified as an important project-specific parameter affecting the magnitude of the errors occurred by overlooking the capacity requirements and its effects on rental and operating costs in the crane location optimization problem. (C) 2016 American Society of Civil Engineers.
机译:选择合适的塔式起重机及其位置可能会大大影响成本和施工过程的持续时间。塔式起重机的位置决定了物料在供需点之间的移动时间,从而决定了运营成本。另一方面,塔式起重机与供应点之间的距离以及塔式起重机与需求点之间的距离极大地影响了起重机的最小所需负载力矩能力,从而影响了起重机的租赁和运营成本。先前关于在建筑工地上优化塔式起重机的位置的研究主要集中在通过最小化塔式起重机的运行时间而使塔式起重机的运行成本最小化,而忽略了塔式起重机的位置对其所需容量以及租赁和运行成本的影响。本文提出了一种改进的起重机位置优化模型,该模型还可以在最小化提升操作总成本的同时,在操作时间之外,考虑起重机位置对其所需容量的影响。开发了一个混合整数编程模型,并将其应用于实际案例研究,以说明在起重机位置优化中考虑起重机位置对其所需容量的影响的重要性。此外,通过假设的案例研究,确定了在不同需求点所需元素的权重之间存在实质性差异,这是通过忽略容量需求及其对租金的影响而影响发生的错误程度的特定于项目的重要参数。以及起重机位置优化问题中的运营成本。 (C)2016年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号